Written on: September 23rd, 2016 in Fishing Report
Important Dredging Information for Indian River Marina
On Tuesday, September 27, 2016, from 8am-12pm, the dredge crew will be installing the pipe that will cross from Burton’s Island to the fairway between A and B docks. Since the pipe will be floating during this process, access to the ocean/bay will be closed for B, C, D and E docks. Also, Drystack customers will not have ocean/bay access as well. The boat ramp will also be closed during this time period. Once the pipe is connected, it will be sank to the bottom and boat traffic can resume as normal, with intermittent closings which are expected during the dredging process. A vessel from the dredge crew will be positioned by the pipe crossing during dredging to offer assistance to boaters transiting the area.
Thank you again for your patience during the dredging. Please use extra caution during the dredging as there will be equipment and dredge personnel in the marina during this process.